中文   English   русский
Home Company Profile News Product Quality Control Certificates Marketing network Contact Us
 
 
Add : Xijin Road, Jingwei Industrial Park of Xi’an, China
Tel : 86-29-86043503 86045381
Fax : 86-29-86043503 86045381
Email : office@xinlongrig.com
 
Trailer Rig


1.    Integral rotation type adopts hydraulic and machinery driving, realizes the  stepless  speed for the workover device and substructure model of carrier; Caterpillar motor matched with Allision transmission is reasonable ,safe ,high efficiency, steady and increases the power ratio of motor.
2.    Drilling and workover equipments are equipped on the carrier increases the movability of equipment, shortens the installation readiness time of rigs and raises the efficiency of drilling.
3.    Integral hydraulic air driving operation system and double crown block saver have worker’s intensity labor relieved and raise the operation safety.
4.    Adopting integral forging brake drum ,force internal recycle cooling, raise the braking safety and service life and is favor of protecting the environment  
5.    Air and flameout protection device and galloping protection device satisfy the special requirements in oil and gas well.
6.    Driving self-propelled floor with 14X 8 of load capacity adopts power steering system so that the rig has good trafficability characteristic and cross-country ability.
7.    The transmission box of rotary table can realize forward gear and reverse gear ,adopts kinds of drilling rod button of circling operation. Reactive torque release device guarantees that during the drilling course drilling rod deformation will be able to release safely.
8.    The truck-mounted drilling rig is designed and manufactured in accordance with API and HSE standard  and meet the international bid requirements

Model
ZJ10/1125CZ
ZJ15/1350CZ
ZJ20/1470CZ
ZJ30/1700CZ
ZJ40/2250CZ
Drilling depth m (ft)
(4-1/2DP)
1000(3280)
1500(4920)
2000(6560)
3000(9840)
4000(13120)
Well servicing depth:m(ft)
(3-1/2DP)
3500(11483)
4000(13123)
5500(18045)
6500(21325)
7500(24606)
Max.hook load:KN(lb)
1125(253000)
1350(303696)
1470(330700)
1700(381260)
2250(505800)
Wireline diameter
mm(in)number
¢26(1”)/8
¢29(1-1/8”)/8
¢32(1-1/4”)/10
Max.hook lifting speed
m/s(ft/s)
1.23(4)
1.33(4.36)
1.31(4.3)
1.36(4.46)
1.36(4.46)
Moving dimensions
(including derrick)m:(ft)
17.5×3.1×4.18
(57.4×10.17×13.7)
19.6×2.9×4.3
(64.3×9.5×13.8)
20.13×3.2×4.4
(66×10.5×14.44)
21.25×3.3×4.47
(69.7×10.8×14.67)
22.45×3.3×4.48
(73.65×10.8×14.7)
Weight :kg(lb)
42000(92590)
51000(112430)
56000(123456)
76000(167548)
82000(180776)
Power system
CAT3406C
CAT3408
CAT3412
CAT3406C
CAT C-16
Engine power :KW(hp)(2100r/min)
343(460)
354(480)
485(650)
343×2 (460×2)
448×2(660×2)
Model of hydraulic transmission
ALLISON-S5600DB
ALLISON-S5600HR
ALLISON-S6610HR
ALLISON-S5600×2
ALLISON-S6610×2
Emergency power
select
select
select
——
——
Classis driven
10×8(8×8)
10×8
12×8
14×8
14×10
Min.turning radius:m(ft)
34(111.55)
34(111.55)
36(118.11)
42(137.8)
44(144)
Min.ground clearance :mm/in
340/13.39
Drawworks
Double drum(single drum)
Drawworks power:hp
450
550
650
750
1000
Diameter of main  drum
diameter
×length mm(in)
¢429×965(¢16.9×38)
¢480×914.5(¢18.9×36)
¢635×1254
(¢25×49.4)
Main brake
Belt type(disc type can be chosen)
Hydraulic disc
Auxiliary brake
WCB224(air cooling brake can be chosen)
WCB324 disc brake
WCB224 disc brake(new)
Drawworks lifting shifts
Five forward one reverse
Derrick model
(double sections extension mast)
JJ119/33.1-W
JJ135/34-W
JJ155/35-W
JJ180/36-W
/JJ180/38-W
JJ225/39-W
Derrick height m(ft)
31.3(102.69)
34(111.55)
35(114.83)
36(118.11)
/38(124.6)
39(127.92)
Racking platform height m(ft)
19.7/20.7(55.77/64.6)
20/21.5(65.62/70.54)
20/21.5(65.6/70.54)
20.4(66.9)
20.4(66.9)
Wind speed km/h(kn)
110(60)
Lighting system
24V/220V/380V(China)
Rated pressure of hydraulic/air MPa(psi)
14/0.833-0.93(2002/119.12-133)
Rig floor
ZT1470/3.7-S telescopic type
ZT1470/4.5-S telescopic type
ZT1690/4.5-Z
fold type
ZT2250/5-Z
fold  type
ZT3000/6.7-Z
fold  type
Rotary table
ZP175(ZP105)
ZP175
ZP175
ZP205
ZP275
Traveling block/hook
YG150
YG150
YG150
YG170
YG225
Swivel
SL120
SL135(SL160)
SL160
SL225
 

Copyright@2012 Shaanxi Xinlong Petroleum Equipment Co., Ltd. All Rights Reserved.
Address:Xijin Road, Jingwei Industrial Park of Xi’an, China, Zip Code:710201
Phone:86-29-86043503 86045381 Fax:86-29-86045366 86043503 E-mail:office@xinlongrig.com